Completed

Number of Successfully Handed Over Projects in Last 10 Years

Name and Value of Works Performed (Civil)

Sl. NoName of the projectName of Employer
1Construction of Dolphin Jetty no.2 & other related facilities(Package no-JW-3)Karnafuly Dry Dock Ltd
2Construction of Dolphin Jetty no.2 & other related facilities(Package no-JW-3Karnafuly Dry Dock Ltd
3Design, Material Supply and Construction of a Jetty including 04 nos. Loading Arms at Mongla Oil Installation, Mongla, BagerhatBPC
4Construction of walkway with quay wall, Bank protection work and over RCC pile in the bank of Tongi areaBIWTA
5Construction of Hostel Building, Principal Quarter Building, Staff Dormitory, Quarter Building, Mosque and Officers Dormitory of Ship Personnel Training Institute SPTI At MadaripurBIWTA
6Construction of entry exit road for back up yard by herring bone bond brick pavement including khal side retaining wall for proposed Lighterage Jetty Behind incontrade container Terminal.CPA
7Construction of Shore protection system along the bank of the river Karnafully at CPAs vacant land Behind incontrade container Terminal.
8Construction of Dophin Jetty at RM-3CPA
9Construction of walkway with quay wall, over pile and Bank protection at Gabtoli area (Borobazar to Terminal)BIWTA
10Construction works for Rehabilitation and physical development of Gol Dighi pond Area (Earth Excavation, Site Protection, Walk way, Retaining wall, Cafeteria and utility building construction, electrification with supply & installation of Generator, sanitary and drainage system, Musical fountain, Landscaping and physical development works) at Cox’s Bazar Thana under CoxDa during the FY 2018-2018 & 2019-2020.CDA(Cox Bazar development authority)
11Construction of RCC Container Yard No-5 near Khal No-7.CPA
12Slope Protection and River Bank Protective Work at Tajumuddin Upazilla sadar along the Meghna River from Km. 58.200 to Km. 58.400 = 0.200 Km in Polder 56/57 during the year 2019-2020. (Package No: TRBW-15-L2)/2019-2020).BWDB
13Construction of Office Building, Staff Dormitory, Electrification, Water Supply System and Ramp/Gangway including others ancillary installation at Narayangonj BIWTA Khanpur Dredger Base Area.BIWTA
14Re-construction of Damaged RCC Jetty at Guptachara Sandwip, Bangladesh.BIWTA
15Construction of Office Building, Staff Dormitory, Mosque, RCC road, Boundary Wall, Internal over head electric line, Deep Tube well, RCC Gangway, Ramp, Steel Gangway, Steel Spud, surface Drain, Bank Protection, RCC Slop ramp at BIWTA, Barisal Dredger Base under Procurement of 20 Dredgers with Ancillary equipment and AccessoriesBIWTA
Except these, there are many other projects which we have completed successfully

Dredging

Sl. NoName of the projectName of Employer
1Dredging work by cutter suction dredger for improving navigability of Laharhat-Veduria river route in the river Tetulia.BIWTA
2Construction of Dolphin Jetty no.2 & other related facilities(Package no-JW-Dredging Work By Cutter Suction Dredger for improving navigability at Surma River from Dowara Bazar to Khaliajuri of Bhairab-Chatak river BIWTA
3Dredging work by cutter suction dredger including dredging related works for maintaining navigability of Mongla -Ghasiakhali Channel for the year 2017-2018 & 2018-2019 (Lot-3)BIWTA
4Dredging work by cutter suction dredger including dredging related works for maintaining navigability of Mongla -Ghasiakhali Channel for the year 2016-2017 & 2017-2018BIWTA
5Dredging work by cutter suction dredger including dredging related works for maintaining navigability of Mongla -Ghasiakhali Channel for the year 2017-2018 (Lot-1)BIWTA
6Dredging work by cutter suction dredger including dredging related works for maintaining navigability of Mongla -Ghasiakhali Channel for the year 2017-2018 (Lot-2)BIWTA
7Dredging work by cutter suction dredger for including dredging related works for developing navigability of Mongla -Ghasiakhali canal (Group-3)BIWTA
8Dredging work by cutter suction dredger for including dredging related works for maintaining navigability of Mongla -Ghasiakhali canal for the year 2016-2017BIWTA
9Dredging Work By Cutter Suction Dredger for improving navigability of Dilalpur-Ghoradigha-Chamraghat-Nikli-Netrokona.BIWTA
10Dredging Work By Cutter Suction Dredger including dredging related works for developing navigability of Dhaka-Sureswar-Angaria-Madaripur river route at Mohisher char in the river Palang and Arialkhan (Lot-5)BIWTA
Except these, there are many other projects which we have completed successfully

Rubber Dam, Chapainawabgan

BPC Project

Cox’sbazar Project

Madaripur Project

Narayanganj Project

Sandwip Project

Aricha Dredger Base

Rubber dam over Mohananda River in Chapai Nawabganj

Rubber dam over Mohananda River in Chapai Nawabganj

Rubber dam over Mohananda River in Chapai Nawabganj

Rubber dam over Mohananda River in Chapai Nawabganj

Rubber dam over Mohananda River in Chapai Nawabganj

Madaripur Project

Cox’s Bazar Project