Ongoing

List of Ongoing Works

1Name of the projectName of
Employer
2Construction of Rubber dam over Mohananda River in Upazila Sadar District Chapai Nawabganj in connection with Dredging of Mohananda River and Rubber dam project under Nawabganj O&M Division, BWDB, Chapai Nawabganj During FY 2020-2021 & 2021-2022BWDB
3Performance-Based Dredging Contract for Improvement Capital and Maintenance Dredging of Navigability of Old Brahmaputra river (Package-5), (Lot-03), CH. 125.00 Km to 142.00 Km.BIWTA
4Performance-Based Dredging Contract for Improvement of Navigability of Old Brahmaputra river Lot-03, CH. 80+00Km to 90+00Km.BIWTA
5Construction of RCC Jetty & Access Road at Nagarbari under the project of Establishment of River Port with allied facilities at Nagarbari.BIWTA
6Construction of RCC Pavement (Open Storage, Parking Lot and Internal Port Road) and Drainage System at Nagarbari under the project of Establishment of River Port with allied facilities at Nagarbari.BIWTA
7Construction of Quay wall, Walkway on Pile, RCC Steps, Bench & Umbrella, Drainage around Quay Wall with Allied Infrastructures along the bank of Turag river from Ramchandrapur to Basila and Rayerbazar khal to Kamrangichar in Buriganga river.BIWTA
8Construction of Bank Protection/Revetment Structure at Nagarbari under the project of Esablishment of River Port with allied facilities at Nagarbari.BIWTA
9(1) Miscellaneous Items (Environmental, Social Safe Guard, Site Facilities Sign Board, Site Office and Provisinol sum) (2) ID NO:- R-3801 Construction of BC Road from South Khailkur Bogar Tak to Moiran Road Via Shohed Siddik Road and Khailkur Primary School. ID NO:- D-3801 Construction of RCC Drain from South Khailkur Bogar Tak to Moiran Road Via Shohed Siddik Road and Khailkur Primary School. ID NO:- R-3802 Construction of BC Road from Kunia Dhaka - Mymenshingha road to Hakim Master road and Joy Bangla road to Hakim Master road. ID NO:- D-3802 Construction of RCC Drain from Kunia Dhaka - Mymenshingha road to Hakim Master road and Joy Bangla road to Hakim Master road.Gazipur City Corporation
10Capital Dredging of Karnafuli River Including Maintenance Dredging from Km 8.400 to Km 10.00 in Between km 5.00 to km 10.00 total 1.600km in Upazila -Rangunia Dist Chattogram under Rangamati O&M Division BWDB Rangamati FY-2019-2020.BWDB
Construction of Naria 50 Bed Upazila Health Complex in Shariatpur Dist.Health Engineering Department (HED)
11Dredging of Turag River by Dredger from km 117.500 to km 123.100 and km 125.100 to km 128.200 Total 8.700 km in connection with Buriganga River Restoration New Dhaleswari-Pungli-Bangshi-Turag-Buriganga River system Project 2nd Revised under Narsingdi O&M Division BWDB Narsingdi during the year 2019-2020.BWDB
12Construction of Walkway on pile, RCC ralling, RCC Steps, RCC Bench, Bank Protection, Walkway, Drainage System with allied works from Batulia to Uzanpur under Tongi river port.BIWTA
13Improvement of RCC road & drain with footpath including street light from Bailla Para to Shahid Sarani road via Gouldighir Par Ch. 0+00 to 1+390m Plus Link 1 : Cox market road Ch. 0+00 to 0+115m, Link 2 : Shankar Mot Mission road Ch. 0+00 to 0+660m, Link 3 : Sweeper Colony road Ch. 0+00 to 0+270m, Link 4: Central Jame Mosque road Ch. 0+00 to 0+330m including bylane Khanaka road Ch. 0+00 to 0+190m, Link 5 : Mohazer para road Ch. 0+00 to 0+345m, Link 6: Zila Parisad road Ch. 0+00 to 0+250m, Link 7: BK Paul road, Ch. 0+00 to 0+304m,.Total Road Length 3854m. Drain Length 3262m. Street Light Length 3854m.CoxsbazarPourashava
Except these, there are many other projects which we have completed successfully